BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Rhein Ruhr Power e.V. - ECPv6.0.8//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Rhein Ruhr Power e.V.
X-ORIGINAL-URL:https://rhein-ruhr-power.net
X-WR-CALDESC:Veranstaltungen für Rhein Ruhr Power e.V.
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/Berlin
BEGIN:DAYLIGHT
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
TZNAME:CEST
DTSTART:20150329T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
DTSTART:20151025T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/Berlin:20150305T120000
DTEND;TZID=Europe/Berlin:20150305T133000
DTSTAMP:20260410T123606
CREATED:20150213T135435Z
LAST-MODIFIED:20180719T130803Z
UID:1583-1425556800-1425562200@rhein-ruhr-power.net
SUMMARY:Grand Challenges: Answers from North Rhine-Westphalia. Flexible power plants for the Energiewende.
DESCRIPTION:At the invitation of North Rhine-Westphalia’s Minister for Innovation\, Science and Research\, Svenja Schulze\, Rhine Ruhr Power e.V. will present the collaborative project “Partner Steam Power Plant” to the EU Community in Brussels. \nIn Europe the use of renewable energy resources (RES) makes considerably progress\, while the installation of high capacity electrical storage systems in the range of GWh of electricity cannot follow. For this transitional period\, thermal power plants on the basis of gas and coal must perform important grid regulation tasks. Thus\, they are essential partners for renewable energies. Existing thermal power plants are only restrictedly suitable to compensate the increasing fluctuating supply from RES. To clearly improve this\, thermal power plants have to be modified. The joint R&D project “Partner Steam Power Plant” North Rhine-Westphalia aims at the development of a high-flexible coal and gas fired power station. \nThe research project “Partner Steam Power Plant” North Rhine-Westphalia is designed to develop new technical concepts to master the challenges for the integration of large proportion of RES. This might guarantee a reliable power supply at any time. \nWhich properties power plants must have for this project? They must have a quick start-up and shut-down time and have to be operated at extreme minimum loads. At low loads they shall have a high efficiency\, too and all that with an extremely environmental compatibility and economic efficiency. \nThe federal state North Rhine-Westphalia (NRW) is home to a large industry for power plants manufactures and power plant operators. The state can boast an extensive and unparalleled network of partners from the research and business communities who work together closely along almost the full length of the value chain. NRW therefore gives strong support to the EU`s energy policy by supporting important R&D projects to cope the challenges in Europe together. \nGrand Challenges: Answers from North Rhine-Westphalia \nThe conference series is directed to European decision-makers\, with North Rhine-Westphalia presenting its proposals for addressing the key issues. There will be ample opportunity for dialogue amongst Europe’s political leaders\, innovative business operators and researchers. \nThe conference will be held in English. \n\n  \nPlease click here for the program and here for the reply card.   \nWe are https://eduessayhelper.org/ working on a prezi presentation to share our learning with parents and other classes
URL:https://rhein-ruhr-power.net/termine/grand-challenges-answers-from-north-rhine-westphalia-flexible-power-plants-for-the-energiewende/2015-03-05/
LOCATION:Representation of the State of North Rhine-Westphalia to the European Union\, Montoyerstraat 47 Rue Montoyer\, Brussels \,  B-1000 \, Belgien
GEO:50.8408597;4.3709325
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Representation of the State of North Rhine-Westphalia to the European Union Montoyerstraat 47 Rue Montoyer Brussels   B-1000  Belgien;X-APPLE-RADIUS=500;X-TITLE=Montoyerstraat 47 Rue Montoyer:geo:4.3709325,50.8408597
END:VEVENT
END:VCALENDAR